Painter Biodata Format for Building, House and Industrial Painting Jobs
A painting contractor or a building maintenance team wants to know what surfaces you have prepared, which paints and finishes you have applied, and whether you can work safely at height. This format puts that work at the top, with your training after it.
When this format is the right one
Use it for a building painter, house painter, wall painter, texture painter, spray painter, industrial painter or painting supervisor job with a contractor, a facility-management company or a factory.
Copy-ready lines for a painter biodata
Copy the lines that are true for you, replace every [bracket] and delete the rest. Contractors check your work on a sample wall, so write only what you have done.
Training lines
- ITI Painter (General) ([NCVT / SCVT]), [ITI name], [year]: [XX]%
- Trained under [contractor name], [city], for [X] years
- Painting product training by [paint company] [only if you attended one]
Work lines: pick what you have done yourself
- Surface preparation: scraping, sanding, crack filling, wall putty in two coats and primer
- Interior and exterior emulsion with roller and brush; enamel on doors, grills and metal
- Texture and design finishes, stencil work and two-colour walls
- Waterproofing coatings on terraces and exterior walls
- Spray painting with an airless or air spray gun on [furniture / fabrication / machinery]
- Work at height on scaffolding and ladders with a safety harness; cleaned and covered furniture and floors before work
Career objective lines
- Building painter with [X] years of putty, emulsion and texture work, seeking a painter job with a contractor in [city].
- Industrial spray painter with [X] years on fabrication and machinery, seeking a painter post in a manufacturing unit.
Blank painter biodata form. Copy into Word
Select the form, copy it into Word or Google Docs, and fill the blanks. Keep a monospaced font such as Courier New so the colons stay lined up, then print it on A4.
BIO-DATA: PAINTER Post applied for : Painter Name : ____________________ Father's Name : ____________________ Date of birth / Age : __________ / ___ years Mobile / Email : ____________________ Address : ____________________ Languages known : ____________________ Training / ITI : ____________________ Surface preparation : ____________________ Paints and finishes : ____________________ Spray gun : Yes / No Work at height : Yes / No Education : ____________________ Experience : ____ years / Fresher 1. Contractor / Company: ______________________ From ______ to ______ Work: ______________ Documents enclosed : ____________________ Declaration: I hereby declare that the information furnished above is true to the best of my knowledge and belief. Place: ____________ Date: ____________ Signature: ______________________
Sample Painter Biodata format
Plain text you can copy straight into Word. Replace the values and the structure keeps working.
| Post Applied For | Building Painter |
| Name | Ramesh Shankar Yadav |
| Father's Name | Shri Shankar Yadav |
| Date of Birth | 10 March 1994 (32 years) |
| Training | Under a painting contractor, 4 years |
| Work | Putty, primer, emulsion, enamel, texture, waterproofing |
| Experience | 10 years: residential and office buildings |
| Marital Status | Married |
| Languages Known | Hindi, Marathi |
| Mobile | 99XXXXXX82 |
| Address | Room 7, Sant Nagar, Kalyan East 421306 |
| Qualification | Board / University | Year | Marks |
|---|---|---|---|
| 10th (SSC) | Maharashtra State Board | 2010 | 48% |
Painter, a building painting contractor, Thane (2016 to present): surface preparation, two-coat putty and primer, interior and exterior emulsion, door and grill enamel, texture walls, terrace waterproofing; work on scaffolding with harness.
Documents EnclosedExperience letter, Aadhaar copy, two photographs.
Date: ______________Signature
Applying somewhere that wants a resume instead? Get yours scored out of 100 free and rebuilt across 15 templates.
Check my resume freeSection by section
Most poor paint jobs fail at the preparation stage. Lines on scraping, crack filling, putty and primer tell a contractor you finish walls that last.
Emulsion, enamel, texture, waterproofing and spray painting are different skills. List the ones you can do without help.
Exterior and building work is done on scaffolding. A line on working at height with a harness answers a question every contractor has.
ITI certificate if any, experience letter or a reference from the contractor you worked with, ID proof and two photographs. Photos of finished walls help for texture work.
What to get right
- Lead with surface preparation.
- List the finishes you can do alone.
- Add a line on working at height.
- Mention spray work separately.
- Keep it to one page.
CVCrisp Jobs: new job postings every morning in one locked Google Sheet, each with a link to apply on the employer's own page. Get the sheet in our WhatsApp community. Looking in Mumbai? See ITI jobs and BPO jobs in Navi Mumbai.
Join on WhatsAppHow the job sheet worksNo job or interview guarantee. We never ask for a fee to get you selected.
Common questions
What should a painter biodata contain?
Post applied for, name, age, contact, training, surface preparation and finishes you know, spray and height work, experience, documents enclosed and a signed declaration.
I have no certificate. Can I still use this format?
Yes. Write where you learned and for how long, and give the contractor as a reference. Many painters are hired on a sample wall.
What is the ITI trade for painters?
ITI Painter (General) is the DGT trade for painters. If you hold it, write it with the year and your marks.
Should I write my daily rate?
Only if the contractor asks. You can write "as per company norms".
CVCrisp builds an ATS-ready resume and an editable Word copy: free to use, and you only pay when you download.
Start free